DatasheetQ Logo
Electronic component search and free download site. Transistors,MosFET ,Diode,Integrated circuits

IS42S16100-10T 데이터 시트보기 (PDF) - Integrated Silicon Solution

부품명
상세내역
제조사
IS42S16100-10T
ISSI
Integrated Silicon Solution ISSI
IS42S16100-10T Datasheet PDF : 78 Pages
First Prev 11 12 13 14 15 16 17 18 19 20 Next Last
IS42S16100
ISSI ®
CKE RELATED COMMAND TRUTH TABLE(1)
Current State
Operation
CKE
n-1 n CS RAS CAS W E A11 A10 A9-A0
Self-Refresh
Undefined
HXXXXXXXX
Self-Refresh Recovery(2)
LHHXXXXXX
Self-Refresh Recovery(2)
L H L HHX X X X
Illegal(2)
LHLHLXXXX
Illegal(2)
LHL LXXXXX
Self-Refresh
L LXXXXXXX
Self-Refresh Recovery Idle State After tRC Has Elapsed
HHHXXXXXX
Idle State After tRC Has Elapsed
HH L HHX X X X
Illegal
HH L H L X X X X
Illegal
HHL LXXXXX
Power-Down on the Next Cycle
HLHXXXXXX
Power-Down on the Next Cycle
HL LHHXXXX
Illegal
HL LHLXXXX
Illegal
HL L LXXXXX
Clock Suspend Termination on the Next Cycle (2) L H X X X X X X X
Clock Suspend
L LXXXXXXX
Power-Down
Undefined
HXXXXXXXX
Power-Down Mode Termination, Idle After
That Termination(2)
LHXXXXXXX
Power-Down Mode
L LXXXXXXX
Both Banks Idle
No Operation
HHHXXXXXX
See the Operation Command Table
HH L HX X X X X
Bank Active Or Precharge
HHL LHXXXX
Auto-Refresh
HHL L LHXXX
Mode Register Set
HHL L L L
OP CODE
See the Operation Command Table
HLHXXXXXX
See the Operation Command Table
HL LHXXXXX
See the Operation Command Table
HL L LHXXXX
Self-Refresh(3)
HL L L LHXXX
See the Operation Command Table
HLLLLL
OP CODE
Power-Down Mode(3)
LXXXXXXXX
Other States
See the Operation Command Table
HHXXXXXXX
Clock Suspend on the Next Cycle(4)
HLXXXXXXX
Clock Suspend Termination on the Next Cycle
LHXXXXXXX
Clock Suspend Termination on the Next CycleL L X X X X X X X
Notes:
1. H: HIGH level input, L: LOW level input, X: HIGH or LOW level input
2. The CLK pin and the other input are reactivated asynchronously by the transition of the CKE level from LOW to HIGH.
The minimum setup time (tCKA) required before all commands other than mode termination must be satisfied.
3. Both banks must be set to the inactive (idle) state in advance to switch to power-down mode or self-refresh mode.
4. The input must be command defined in the operation command table.
Integrated Silicon Solution, Inc. — www.issi.com — 1-800-379-4774
17
Rev. C
11/01/01

Share Link: 

datasheetq.com  [ Privacy Policy ]Request Datasheet ] [ Contact Us ]